How to cover the ceiling with plastic panels in the bathroom?

In the bathroom, covering the ceiling with plastic panels is a useful and fashionable way to improve the appearance of your area. Plastic panels are a popular option for homeowners looking to update their bathrooms because they are inexpensive and simple to install. They have a sleek, contemporary appearance and are mold and moisture resistant, which are critical characteristics for bathroom materials.

Ensure you have all the tools and materials you need before you begin. Plastic panels, a measuring tape, a saw or utility knife, screws or adhesive, and a level are required. Select panels made especially for use in bathrooms, as they are more resilient to the moist atmosphere.

An installation that goes well depends on preparation. To estimate how many panels you’ll need, start by taking a measurement of your ceiling. Next, trim the panels to size, making sure to leave a tiny space around the edges to accommodate expansion. Use glue to create a seamless appearance when directly attaching the panels to the ceiling, or screws for a more stable hold.

It’s an easy installation procedure. Press each panel firmly into place as you move across the ceiling, starting at one corner. To ensure that every panel is properly aligned, use a level. Cut the panels to fit around any obstructions, such as light fixtures, being careful to keep the finish neat.

You will have a gorgeously updated bathroom ceiling that is both fashionable and practical once all the panels are installed. Because plastic panels are so simple to keep clean and maintain, your bathroom will continue to look great for many years to come. Without requiring major renovations, this easy upgrade can give your bathroom a contemporary feel and significantly improve its overall vibe.

Step Instructions
1 Measure the ceiling to determine the number of panels needed.
2 Cut the panels to the required size using a utility knife.
3 Install the ceiling profile or battens for support.
4 Attach the first panel to the profile or battens, ensuring it is straight.
5 Continue attaching panels, snapping them together tightly.
6 Trim the last panel if necessary to fit the remaining space.
7 Install finishing trim around the edges for a clean look.

Materials and tools

  • hammer drill or impact drill;
  • construction or laser level;
  • hacksaw for metal;
  • screwdriver;
  • measuring tape and pencil;
  • plastic panels;
  • ceiling lamps;
  • cable;
  • metal profiles and hangers;
  • ceiling moldings or starting profile;

  • screws and dowels.

Material calculation

Drawing a plan based on the room’s dimensions will help you determine how much material you’ll need when installing a plastic panel ceiling in a bathroom. Because bathrooms and toilets are typically small spaces, the panels covering them will need to be cut to the appropriate length. The plan will assist in carrying out a cost-effective panel layout. To accomplish this, divide the drawing’s area by the width of a single panel; then, modify the resultant number to account for the material’s trimming.

Use wooden blocks or a metal profile to assemble the frame. It is advised to use a galvanized profile in rooms with high humidity levels. It is put in 400 mm intervals that are perpendicular to the panel’s length. The number of guides can be easily calculated using these parameters. The computation of the hanger count is based on the guidelines provided for a particular profile type; however, the hanger installation process must not surpass 600 mm.

10% of the safety stock is added to the value that is calculated along the room’s perimeter to account for moldings or an initial plastic profile.

Preparatory work

Prior to installing a PVC panel ceiling in the bathroom, the following detailed plan must be followed in order to complete the necessary preparatory work:

  1. old coatings (paint, tiles, whitewash, plaster) are removed from the surface of the floor slab;
  2. The surface cleared of old coating is inspected for cracks and chips. Detected defects are eliminated with putty;
  3. the cleaned and leveled surface is impregnated with a concrete primer with antiseptic additives. Often, novice builders skip this stage of preparing the ceiling, but in damp rooms, the under-ceiling space becomes a breeding ground for fungus and mold, even if effective ventilation is provided. Priming will help eliminate this problem. The primer is applied to the surface twice, the second layer can be applied only after the first has completely dried;
  4. while the soil is drying, you can cut the material to size. The length of the panel should be 5-7 mm less than the distance from wall to wall.

Laying wiring

Lighting wiring needs to be installed in the bathroom before plastic paneling can be covered over the ceiling. After fastening the frame in corrugated pipes, cables are installed in the interceiling space. By taking this precaution, wires and connections will be shielded from unintentional moisture and subsequent short circuits.

With the use of unique plastic clamps, the corrugation is fastened to the ceiling slab. A cable is brought out to connect the lamps while the wiring is being installed in the locations where they are installed. After wiring is finished, test the system’s functionality and fix any issues that arise.

Instructions for installing PVC panels with glue

The simplest method is to use glue to mount plastic panel ceilings in bathrooms; however, this method requires a base that is level and has height differences of no more than 3 mm per square meter. Since it is impossible to install built-in lighting on a glued ceiling, they will only install hanging lamps in this situation.

You need to adhere to the subsequent sequential algorithm in order to adhere the panels to the ceiling slab:

  • It is recommended to glue the panels without a starting profile. After installing all the panels, a polyurethane foam plinth is glued around the perimeter of the room, which will hide the place where the ends of the boards come into contact with the walls;
  • panels are cut to size;
  • panels are installed with the ridge to the wall. To install the first panel, it is recommended to remove the ridge with an electric jigsaw to ensure tight contact with the vertical surface;
  • liquid nails or other suitable glue in tubes are applied to the inside of the board using a gun in a zigzag manner;
  • the panel is applied to the place of fixation and pressed over the entire surface, excluding the groove. The next panel is inserted into the groove and only after that the first panel is finally pressed;

  • the finishing board is mounted simultaneously with the penultimate board, immediately inserting it into the groove. The pre-finishing board is cut in width to the required size.

Instructions for installing plastic panels on the sheathing

When concealing communications is required or when fixing ceiling slab flaws proves to be challenging, a suspended ceiling with lathing is employed.

Marking the surface for the frame structure is a necessary first step in the construction process. Execute the subsequent actions:

  • Use a laser level to find the lowest angle in the room.
  • From the found point, measure the distance necessary so that lamps and communications can be placed inside the ceiling space.
  • Using a laser level, mark a line on the walls along the second mark. If drawing is inconvenient, you can install self-tapping screws at the required points in the corners and pull the chalk tapping cord.
  • Focusing on the lower border of the ceiling, draw the installation lines for the guides.

  • Along the lines, the mounting points for the suspensions are drawn.

You can start assembling the frame after applying the markings.

Frame preparation

The following actions must be taken in order to install the supporting frame:

  • the metal profile is cut to size;
  • along the perimeter of the room, at the height specified by the marking lines, guides are fixed to dowels;

  • holes are drilled at pre-marked points and perforated hangers are mounted on dowels;
  • longitudinal guides are attached with self-tapping screws to perforated hangers. When installing the guides, it is necessary to monitor the correspondence of the heights, for which it is recommended to pull the cord from corner to corner along the guides already installed around the perimeter;

  • if necessary, the height of the guides is adjusted.

Panel installation

The following algorithm is used to carry out the self-installation of plastic panels on the ceiling:

  • on three sides around the perimeter it is necessary to attach starting strips to dowels into which the boards will be inserted;
  • the board is cut to size and freed from the protective film. If the ceiling is flat and has no differences in the distance from wall to wall, you can immediately cut the entire set of boards to size (the length of the panel should be 7 mm less than the distance from wall to wall);
  • The first board is installed with a spike to the wall, tightly driving it into the grooves of the starting planks from three sides. The installed panel is fixed to guide screws in the groove;

  • The following boards are installed in the same way as the first;

  • In the process of setting the ceiling coating, it is necessary to immediately cut holes under the built -in lamps.

How to install the last strip

The final panel needs to be trimmed to fit, keeping in mind the design of the board on the starting bar and in the groove. After carefully placing the final board with the starting bar in its proper location, the panel is inserted by its trimmed side into the starting strip and trained at an angle into the penultimate boards’ groove. It is required to use dowels to secure the end starting bar after the final board is installed.

In your bathroom, covering the ceiling with plastic panels is an easy and affordable way to achieve a contemporary, waterproof finish. This procedure entails picking the appropriate panels, prepping the ceiling, and securely installing the panels with basic tools. Even a do-it-yourself enthusiast can finish this project in a few hours with careful measuring and cutting, turning the bathroom ceiling into a sleek, low-maintenance piece that withstands mold and moisture. To ensure a polished finish that improves the overall look and usability of your bathroom, follow our step-by-step guide.

Installation of lamps

Lamp installation completes the ceiling coating installation.

What lamps are suitable

The following guidelines should be kept in mind when selecting lights for a bathroom suspended ceiling:

  • Ceiling recessed lights in the shower stall should be selected from models with power up to 24 V. Security degree – 45IP.
  • To illuminate other areas of the ceiling, you can use any moisture-proof lamps with a voltage of 220 V, or 12-24 V with transformers.
  • It is best to use LED lamps for bathroom lighting, which provide diffused light.

How to install them

When installing the suspended ceiling frame, preliminary cable laying is done, and when installing the panels, holes for recessed lighting are cut out. Cutting holes for lamps with a wood crown that match the built-in part of the lamp’s diameter (usually between 58 and 74 mm) is a convenient method.

To install lighting fixtures without interference, prepare cable loops that are between 100 and 150 mm long before installing wiring for each lamp.

The installation of the lamps starts after the panel installation is finished. After each device is connected to a cable loop, the housing is fixed in the completed hole in the panel.

Using some simple tools and a little perseverance, covering the bathroom ceiling with plastic panels is a useful and attractive solution. Measuring the ceiling, cutting the panels to fit, and fastening them in position are the steps in the process. Your bathroom can look better overall with a professional-looking finish that you can achieve with careful planning and attention to detail.

Because of their strength and resistance to water, plastic panels are a popular option. They are perfect for the damp atmosphere of a bathroom because they are simple to maintain and clean. They also come in a range of colors and patterns, so you can alter the appearance to fit your own style.

Even a novice do-it-yourselfer can install plastic ceiling panels successfully if they follow the detailed instructions. Always take your time and make sure that every panel is fastened and aligned correctly. This project raises the value of your house in addition to improving the look of your bathroom.

Plastic ceiling panels offer an affordable and attractive solution for remodeling an old bathroom or finishing a new one. You can make a long-lasting change to your bathroom ceiling with the correct supplies and a little work.

Video on the topic

Finishing the ceiling in the bathroom with PVC panels

Ceiling made of plastic panels

Installation of plastic panels on the ceiling

Installation of panels on the ceiling

How to install the latest PVC panel on the ceiling

█ Ceiling in the BATHROOM. In 15 minutes all TIPS / installation of PVC panels / Ceiling

Do-it-yourself installation of PVC plastic panels on the CEILING

DIY bathroom ceiling in 15 minutes. Tricks and secrets of installing ceilings with gold panels!

What factor is most important for you when choosing materials for building a house??
Share to friends
Timur Kiselev

Professional builder with 15 years of experience. I know everything about the construction of houses, cottages, bathhouses and other buildings. I will be happy to share my knowledge and experience with you.

Rate author
StroyArsenal62.com
Add a comment