How to determine the consumption of mortar per cubic meter, per square meter of masonry

Understanding the precise quantity of materials required for any construction project is essential to preventing waste and guaranteeing effectiveness. This is particularly true with mortar, which is essential to masonry work. Determining the exact amount of mortar needed can ensure the structural integrity of the build while also saving time and money.

Understanding a number of variables, including the type of masonry, the size of the bricks or blocks, and the thickness of the mortar joints, is necessary to calculate the amount of mortar used. Because these variables can differ greatly between projects, it’s critical to customize computations to the particular requirements of your work.

We will look at how to calculate the amount of mortar required for each cubic meter and square meter of masonry in this guide. To assist you in producing precise calculations for your construction projects, we’ll break down the procedures, offer helpful advice, and provide real-world examples. Whether you’re an experienced builder or a do-it-yourself enthusiast, knowing these concepts will make your masonry work turn out better.

What affects the consumption

Bricks are joined together by mortar. Without it, building a wall is not possible. It needs to be of the highest caliber, prepared correctly, and the right consistency. Its type of composition is one of the crucial factors that needs to be considered when computing. Four types of mortar are most commonly used:

  1. Cement-sand mixture. It consists of cement, sand and water. This composition can be called the most durable, if you strictly adhere to the application technology. Otherwise, there is a danger that it will crack.
  2. Limestone mixture. It does not contain cement, it is replaced with quicklime. The mixture is quite plastic, and it is easy to work with. But, there is one drawback – the rain will easily wash it away. That is why it is used only for interior work.
  3. Mixed solution. The composition of this mixture is combined, and combines materials from the first two types. As a result, a high-quality solution is obtained, superior to the first two.
  4. Composition with a plasticizer. Sand of fraction 2 mm and cement are additionally mixed with a polymer additive, which increases its plasticity.

These are the most popular mixtures that are used in construction. But, you should know that not only they affect the consumption. An important factor is the brick itself. Its size, format, ability to absorb water and the presence of voids directly determine how much mortar will be in 1 m2 of brickwork. In general, consumption per 1 m2 is 0.2–0.25 m3. It all comes down to the fact that the thickness of the wall plays a role, be it half a brick, one, one and a half or two. The greater the thickness, the greater the consumption. The same goes for the shape of the brick. For example, if it is large, then the flow rate is reduced, if it has holes, then the flow rate increases significantly. How to calculate mortar for bricklaying?

Understanding the factors that influence mortar consumption is essential when estimating the quantity of mortar required for masonry work. These consist of the project’s overall dimensions, the size and thickness of the joints, and the kind of masonry unit used. You can determine how much mortar you’ll need per cubic meter or square meter of masonry by precisely calculating these factors, which will ensure you have enough materials for a long-lasting and stable structure without wasting any.

SOLUTION CONSUMPTION PER 1 M3

Consider the following information to determine how much mortar is needed for every 1 m3 of brickwork. A typical brick measures 250 by 120 by 65. The following standards indicate how much mortar is required for every m3 of brick laid:

  • 0.189 m3 when built in half a brick (120 mm);
  • 0.221 m3 when built in one (250 mm);
  • 0.234 m3 for construction of one and a half (380 mm);
  • 0.240 m3 when built in two, (510 mm);
  • 0.245 m3 when built in two and a half, (640 mm).

It turns out that 0.0006305 m3 of mortar are needed for every standard brick. When this is converted to liters, 75 liters of the final mixture fall for every square meter that is 12 cm thick, and 115 liters are consumed when the thickness is 1.5 bricks (380 mm).

When discussing thickened (modulated) products, the following is the consumption for products with a size of 250 × 120 × 88:

  • 0.160 m3 of the composition, when working in shelter (120 mm);
  • 0.20 m3 of the composition, when working in one, (250 mm);
  • 0.216 m3 of the composition, when working in one and a half, (380 mm);
  • 0.222 m3 of the composition, when working in two, (510 mm);
  • 0.227 m3 of the composition, when working in two and a half, (640 mm).

It is evident from these data how the material’s size influences the masonry cube of brick’s flow consumption. There is a general rule that states that the composition needed is less the larger the area. With this information, you can mix the proper quantity of masonry mixture. All you need to do is figure out the total meter and multiply it by the 1 m3 consumption. You are now ready to buy supplies for your job. The cement and additive consumption needed to achieve the desired composition consistency is shown in the table below.

Calculation Method Description
Per Cubic Meter To determine the consumption of mortar per cubic meter, you need to know the volume of the bricks and the thickness of the mortar joints. Subtract the volume of the bricks from the total volume of the masonry to get the volume of the mortar required.
Per Square Meter For consumption per square meter of masonry, calculate the number of bricks needed for one square meter and multiply by the volume of mortar required for one brick. This will give you the total mortar needed per square meter.

Effective planning and cost control for masonry projects require an understanding of how much mortar is used. You can ensure a more seamless construction process by avoiding both shortages and excesses by precisely knowing the amount required per cubic meter and per square meter.

Start by determining the kind of masonry work you’re performing and the size of the blocks or bricks to determine how much mortar you’ll need. Different construction methods and materials will call for different mortar requirements. For precise measurements, always consult industry standards and manufacturer guidelines.

Remember to take into consideration things like the possibility of waste and the thickness of the mortar joints. These factors should be taken into account in your calculations as they can have a significant impact on the total amount of mortar needed.

Armed with these computations, you can decide on material purchases and work schedules with confidence. This keeps your construction or repair work more productive and economical while also keeping your project on schedule and within your budget.

Video on the topic

Two cubic meters of crushed stone clearly! How many squares will be enough? Fraction 5-20

What factor is most important for you when choosing materials for building a house??
Share to friends
Timur Kiselev

Professional builder with 15 years of experience. I know everything about the construction of houses, cottages, bathhouses and other buildings. I will be happy to share my knowledge and experience with you.

Rate author
StroyArsenal62.com
Add a comment