A stable and long-lasting flooring system is ensured by attaching logs to a concrete floor. This procedure offers a strong base for any kind of flooring, including laminate and hardwood.
There are various ways to fasten logs to concrete, and each requires a different combination of equipment and skills. The materials you have on hand and the particular requirements of your project will determine which approach is best.
In addition to helping you achieve a professional finish, knowing the guidelines and best practices for this task will help you avoid problems like uneven flooring or squeaks. Let’s examine the most popular techniques and the crucial actions to take in order to ensure a successful installation.
- What kind of material is this?
- Requirements
- Do I need to attach to a concrete base?
- Methods
- Preparatory stage
- Installation materials and tools
- What can you put in?
- How to fix it correctly?
- Self-tapping screws
- Anchors
- Corners
- Using coupling supports
- On adjustable plugs
- Possible difficulties and errors
- Advantages and disadvantages
- Types of coating for laying over
- Useful video
- Video on the topic
- Plywood on joists…attaching joists to concrete floor
- Adjustable floor joists! Installation, installation step by step instructions.
- PERFECTLY FLAT BASE / Adjustable joists from Parquet Workshop
- FLOORS MADE OF PLYWOOD, JOINTS AND ANCHORS! installation technology!
- FLOOR JOOTS! Detailed installation! ADJUSTABLE FLOORS + JOINTS!
- How to attach smallpox to a concrete screed
- Attaching joists to concrete floors
What kind of material is this?
This unique design serves as a foundation for the final floor covering to be laid later. Beams and timbers are the materials used. The proper square or rectangle section ensures a stable fixation of the upper materials.
A cement screed is used to lay the material. Simultaneously, a small step is formed for a more stable floor fixation. The resultant space is filled with insulation. Wires and pipes used in communication can be concealed here.
Creating a smooth floor covering is the primary goal of log laying. In this instance, restoring seriously damaged concrete screed won’t require you to perform intricate work.
Requirements
To ensure that there are no height variations or floor squeaks when putting in a floor on wooden logs, make sure the wood is properly dried.
The maximum moisture content for wood is 12%. If the material is chosen ahead of time, standard storage conditions must be selected.
Avoid placing outside or in damp environments. In order to achieve a superior coating, the beam’s height ought to be 1.5–2 times larger than its width.
The window is laid perpendicular to the wall it is positioned along. The thickness of the flooring that will eventually be installed on top must be considered.
Experts advise keeping a 30-to 40-centimeter gap between each log on average. This is the best way to prevent floor damage or creaking while the machine is in use.
Do I need to attach to a concrete base?
Installing a floor on logs is a popular choice for residential spaces. Installation in apartments with a significant height differential from the base level is also advantageous.
This method’s benefit is that it can be used to install surface insulation, soundproofing materials, or a sturdy subfloor. You can level practically any base in this way. The direct load on the foundation is greatly decreased by correct installation.
Not only does attaching joists level the base at a low cost. To eliminate cold floors, this technique is advised for city apartment buildings’ first floors.
Methods
The following fastening techniques are used to lay the logs on top of the concrete screed:
- Self-tapping screws. This is the most accessible and simple way with good results. Through holes are created in the beams with a symmetrical arrangement in the concrete base. Fix a plastic dowel into which screws are screwed. Depending on the type of flooring, a step of 40 to 80 cm is recommended.
- Anchors. The method is characterized by durable and reliable fastening. The beam is held in place for a long time, and the structure as a whole acquires additional rigidity. The anchor is essentially a reinforced dowel. The advantage is resistance during the leveling process, which allows the installation of heavy structures.
- Corners. Galvanized metal corners are used to secure the concrete floor and beams. One of the sides of the element is connected to the beam, and screwing occurs with a self-tapping screw into the wood. Depth is 3 to 4 cm. The installation process is performed at an angle to achieve increased strength characteristics.
Installing adjustable joists is an additional technique. Although the system requires more money to install, it makes positioning objects in the proper horizontal orientation simpler. Dowels are used to secure stands that are screwed into the wood and fastened to the base. You can modify this design by turning specific bolts that are already installed.
Preparatory stage
The first step in preparation is deciding on a step width. The relationship that follows is utilized:
- floor covering thickness 2 cm – lag installation step – 30 cm;
- 2.4 – 40 cm;
- 3 – 50 cm;
- 3.5 – 60 cm;
- 4 – 70 cm;
- 4.5 – 80 cm;
- 5 – 100 cm.
You will need to perform calculations regarding the logs’ cross section. The room’s dimensions, the type of wood, and the thickness of the proposed flooring are first considered. Future coverage loads that might occur are also considered.
Consequently, the average load in living rooms is 33 kg/sq. m. One section measuring 100 by 50 mm is permitted if the length of the room is less than two meters. A beam with a supporting edge that is 1.5–2 times wider than the width is the best option.
Understanding important procedures and guidelines is necessary to ensure a safe and long-lasting installation when attaching logs to a concrete floor. These procedures include adequate planning, the use of appropriate materials, and following suggested practices to create a level and stable base for your flooring project.
Installation materials and tools
For covering joists with flooring The following equipment will be necessary:
- square;
- brush;
- broom;
- building level;
- sharp knife;
- chisel;
- screwdriver;
- hammer drill for connecting the joists to the ceiling;
- jigsaw for cutting and sawing the coating;
- pencil;
- roulette.
In terms of the selection of materials, these are employed:
- beams;
- plywood for fixing as a subfloor;
- thermal insulation and sound insulation.
What can you put in?
Whatever the installation technique Logs cannot be directly fixed to a concrete base.
This may cause the wood to deteriorate quickly. After removing the gravel powder, apply roofing felt sheets as a layer. You can also use mastic.
This decision considerably lowers the amount of noise and vibration that is transferred through fastening components or individual parts.
When installing logs in a private residence, the concrete floor is frequently covered with a vapor barrier membrane or a film. To guarantee absolute tightness, tape is used in areas where anchor bolts or corners are installed.
Additionally, wooden supports are treated with mastic coating insulation. This stage offers moisture protection. There is also less chance of squeaks.
How to fix it correctly?
There are the following mounting choices available: From log to screed of concrete:
- anchors;
- self-tapping screws;
- corners;
- coupling supports;
- on bricks;
- on adjustable plugs.
It’s critical to decide on your preferred approach in advance. This will determine a lot of the steps to take as well as the supplies and equipment needed.
Self-tapping screws
This is the most cost-effective option. Only galvanized self-tapping screws with a diameter of at least 4.2 mm should be used in this situation. The length ought to match the log’s thickness plus an additional 50–60 mm.
The joist has through holes drilled into it, roughly spaced 50–60 cm apart. The screw heads are set deeply into the wood’s surface. In this instance, the room is filled with logs, and the ceiling is fixed with a hammer drill bit until it is 60 to 80 mm deep. The resulting hole is filled with a dowel, and the screws are then driven through the joists.
Anchors
It’s done in a manner not unlike from selecting self-tapping screws. The use of metal anchors as opposed to plastic dowels is the distinction.
Self-tapping screws are swapped out for bolts or studs. A slightly larger-diameter hole than the washers is made in the upper portion of the logs. The nut or bolt head should be hidden in relation to depth.
Fastened beneath the joist are washers and nuts that allow you to adjust the joist’s mounting height. A grinder is used to remove the protruding portion of the stud, and special pads are needed.
Bolts and studs need to be at least 10 cm in diameter.
Corners
The corners are galvanized or fastened with unique U-shaped fasteners. To obtain the best strength, experts advise using parts that have a stiffener or that have a reinforced version of the design. Once the beams are arranged on the floor, connection points are chosen. Plastic dowels are used to connect directly to the base.
Across the beam, the corners are arranged in a checkerboard pattern. In this instance, the log cannot be placed in the air; instead, it must rest directly on the pad or ceiling.
Using coupling supports
The ability to fasten the logs without drilling is generally advantageous when utilizing reinforced concrete floor slabs as a foundation. Anchor holes are drilled at a depth of 4-5 cm.
Anchor bolts are not used, but rather a coupling. This is accomplished by pressing the upper portion into the inside of the joist and screwing it straight into the coupling. A metal support plate serves as a representation of the lower element.
Premium red brick is utilized in place of an angle or anchor bolt. No cracks or cavities permitted. Single or one-and-a-half bricks would be wise choices.
A primer is applied to the marking line, improving its adhesion qualities. Four hours later, brick laying starts. Masonry mortar is used during fixation. After that, logs are affixed on top, a hole is made in the wood, and fasteners are driven 4–5 centimeters into the brick.
On adjustable plugs
Relevant if a subfloor made of a thin sheet of plywood will be utilized. These are basically support plugs. The tubular components are installed after the joists have holes drilled in them in accordance with the template. Once the plug is rotated, you can precisely measure the log location’s height and horizon.
A trustworthy mount to the concrete screed is completed at the last phase. The culpable mount is employed, enabling hammer repair. A screwdriver is used in dowel-groove applications.
Possible difficulties and errors
Selecting initial measurements and making markings are crucial. It is only in this situation that a flat flooring is produced, one that will hold up over time and with consistent use.
Additionally, the fastening technique is chosen beforehand. Selecting the appropriate number of fasteners with a suitable thickness and a margin of error is crucial. This makes the workflow continuous.
Advantages and disadvantages
There are several distinct benefits that can be identified:
- High thermal insulation properties. A heater is laid between the lags, which protects from cold air entering the room. This is the best option for both private houses and apartments in multi -storey complexes.
- Soundproofing properties. Achieved by installing a special layer between the floors.
- Even load distribution. Thanks to the small step of fixing the joists, minimal load is ensured on individual areas of the floor covering.
- Efficient Leveling. Logs allow you to quickly obtain an even coating without leveling the concrete base.
- Increased strength. With the private installation of individual logs, the strength characteristics reach loads of 5 tons per square meter. m.
- Easy installation. The work does not require a professional team of installers. The structure can be installed independently without the use of expensive or complex equipment.
Fitting a floor on joists has certain drawbacks as well. Natural materials don’t hold up well to moisture. As a result, using vapor barriers and waterproofing is also essential.
Types of coating for laying over
With delays The floor coverings listed below are in use:
- ceramic tile;
- porcelain stoneware;
- piece parquet;
- linoleum;
- laminate;
- parquet board.
High-quality and accurate log installation is the key to achieving the top layer’s high performance characteristics.
Useful video
Great advice on fastening from the expert:
Method | Description |
Direct Screwing | Using screws to attach logs directly to the concrete floor. Requires pre-drilling holes in both logs and concrete. |
Concrete Anchors | Using anchors embedded in the concrete to secure logs. Provides a strong hold and is suitable for heavy loads. |
Glue and Screws | Applying a construction adhesive to the bottom of the logs and then securing them with screws. Combines adhesion with mechanical fastening. |
Epoxy Resins | Using epoxy to bond logs to the concrete. This method is durable and ideal for areas with high moisture levels. |
When the proper procedures and guidelines are followed, attaching logs to a concrete floor is a simple process. A solid and stable floor foundation is ensured by being aware of the various methods, which range from employing adhesives to anchor bolts. Every approach has pros and cons that vary based on the particular needs of your project.
Before installation, the concrete surface must be properly prepared. Make sure the surface is level, clean, and free of debris. Efficient preparation facilitates improved log adhesion and stability.
Considering the kind of load your floor will support as well as the environmental factors, select the appropriate technique. Mechanical fasteners, such as anchor bolts, offer superior support for heavy loads. Moisture-resistant adhesives are useful in areas where moisture is an issue.
Lastly, whenever using tools and materials, make sure you adhere to manufacturer instructions and safety precautions. Making sure the logs are firmly fastened improves the overall safety and integrity of your building project in addition to offering a strong and steady floor.