Rotband – plaster based on gypsum. How to putty with this solution?

Rotband plaster is a well-liked gypsum-based product that is frequently utilized in building and remodeling projects. Rotband, which is well-known for its adaptability and simplicity of use, is perfect for producing even, smooth surfaces on walls and ceilings. Whether you’re a do-it-yourself enthusiast or a professional builder, knowing how to use Rotband can greatly improve the quality of your finishing work.

There are a few simple steps involved in applying Rotband plaster, but the best results require careful planning and close attention to detail. Make sure the area you want to plaster is dry, clean, and devoid of any loose materials before starting. To achieve the correct consistency, it’s also critical to thoroughly mix the Rotband solution according to the manufacturer’s instructions.

You can begin applying the Rotband as soon as your plaster has been mixed and your surface is ready. Spread the plaster evenly using a trowel, smoothing out any ridges or bumps as you go. Start at the bottom and work your way up. You can attain a uniform finish by using a methodical and consistent approach. Let the plaster to partially set after the first application before making any necessary corrections.

Knowing when to stop smoothing and start letting the plaster set is essential for a perfect finish. Overworking the plaster can result in an uneven surface that will require more sanding down the road. You’ll eventually be able to use Rotband plaster to produce results that are on par with those of professionals, but patience and practice are essential to mastering this technique.

The history of the creation of this plaster

The German word "rotband" means "red ribbon." The brands "Green Ribbon," "Golden Ribbon," and "Blue Ribbon" were introduced to the market prior to its manufacturing. This is the origin of the idea of "cigar bands," which were first offered for sale in 1854. Because of this, it was able to determine the manufacturer with accuracy and trust in his reputation.

In 1962, the brand’s initial products were produced in West Germany. The company’s original headquarters were in the German town of Perl. In 1938, the first gypsum stone mine was put into operation. The German province started producing drywall sheets for the first time in 1972. It was decided to move the head enterprise to the American zone of occupation actions following World War II.

At this point in Rotbanda mass production, the current composition’s properties need to be improved. Gypsum adheres quickly, which has made it a major barrier to long-term work. The Alenal replacement was created as an addition. She prolonged the operation time of the completed mixture by slowing down the process of grasping the closed mixture.

Specifications

The Rotband mixture’s composition makes it both environmentally friendly and universal. Gypsum is the primary astringent; it provides moisture, absorbs excess evaporation, and controls the room’s microclimate. It is sufficient to dilute a dry mixture purchased with water and thoroughly mix.

Applying in a single layer is incredibly cost-effective. To provide the desired surface characteristics, it is sufficient. The applied layer is about thirty millimeters thick. Rotband dries at a pace of one millimeter per day. Packaging for the mixture comes in 5, 10, and 30 kg quantities. enclosed in paper bags.

Depending on the batch of minerals used in the composition, the color is not consistent. Different shades of binder components (gray, pink, beige, or white) can be produced. The mixture’s quality is unaffected by color in any way.

About 8.5 kg are consumed per square meter. The layer is roughly 15 mm thick. Such a layer will typically require 12.75 kg of putty. The resultant number needs to be increased by 10% for a reserve. It takes 14 kg to plaster one square meter. This amount needs to be multiplied by the work area, and the resulting number needs to be divided by 30 (for a bag weighing 30 kg), 5 (5 kg), or 10 (10 kg).

Cost of pasta

The price of rotband plaster varies throughout Russia. The manufacturer’s wholesale price and the town or city’s proximity to the manufacturer’s warehouse have an impact on the price.

The cost of the material varies slightly depending on the city. Price is also impacted by packaging. Larger packaging is more cost-effective for large-scale projects because its overall cost will be lower. However, the more packaging, the more expensive it will be.

A 30 kg bag costs 455 rubles, a 5 kg bag costs 180 rubles, and a 10 kg bag costs 270 rubles. Professional pastes are the new way that improved mixtures are available on the market. The standard weight is 8 kg, and the cost is around 1,000 rubles.

Instructions for use

Preparation of the solution

The product packaging itself contains instructions on how to use and operate the Rotband mixture. Plan for preparing the solution:

  1. For 30 kg of mixture you need to take 18 liters of water. The temperature of the liquid should be at room temperature. If it is cold or too hot, lumps will form and the solution will set quickly, which is undesirable.
  2. Fill the container with the mixture poured into it with water. You need to knead in small portions. For the entire work, more than 3 portions in a row must be mixed. It is necessary to carefully pour water into the solution, stir it vigorously.
  3. To knead, use a drill or a construction mixer. This tool will create the correct consistency, reminiscent of thick sour cream.
  4. Leave the mixture for 10–20 minutes to improve the elasticity of the plaster, and then knead again.
  5. When preparing the solution, you should not pour water twice, as the adhesive characteristics of the composition will decrease and the plaster will be applied unevenly.
  6. The temperature regime in the room where Rotband is prepared must be observed. The air temperature should be from +5 to +30 degrees. Humidity – no more than 60%.

Surface preparation

Remove all traces of the previous coating from the walls before applying Rotband putty. Even oily blemishes from the prior finish have been thoroughly cleaned off the concrete base. A uniform and smooth surface must be created. Should any metallic components remain within the wall, they undergo treatment using an anti-corrosion agent.

In order to achieve uniform application and adhesion of the plaster to the base, the wall or ceiling must be primed after cleaning and leveling the surface. Priming is typically done in several consecutive steps. Once the previous primer layer has fully dried, the next one must be applied on top of it.

It is necessary to begin installing the beacons after the primer has dried. This crucial step will aid in the uniform application of the plaster layer. The number of beacon profiles is chosen based on their size (6 or 10 mm).

The beacons need to be undamaged and free of rust. They need to be handled carefully during transit. After cutting them to the correct length, they must be pressed into the plaster to be installed.

What to do the work with: tools

The following instruments are required in order to work with Rotband putty:

  • brush or roller for applying primer to the surface;
  • a plumb line or level to correctly measure direction and slope;
  • metal profiles 6 or 10 mm wide at your discretion;
  • rule for leveling the mixture and directing it along the plane;
  • wide spatula (for applying putty) and narrow (for applying a small amount of mixture to a wide tool);
  • a construction mixer or drill for uniform mixing of gypsum particles and water;
  • metal rail;
  • hard sponge or metal grater.

How to putty?

Apply a tiny bit of the composition to the base using a wide spatula. Motions ought to be made from top to bottom. One must travel the entire distance between two beacons at once. Maintaining a distance of approximately one meter is required both in width and height between the beacons. The layer needs to be actively straightened using a large rule that has an easy-to-hold holder.

This is accomplished by applying a lot of pressure to the rule against the beacons and pulling the applied mass out in zigzag motions. Using a narrow spatula, remove any excess that is still on the tool and re-distribute it across the surface. Rotband plaster has highly malleable qualities. Once you’ve finished leveling, you must again apply the rule from bottom to top along the entire base because it can easily slide under its own weight.

If the walls are not level, you will need to add more mortar to create a thicker layer of plaster—10 mm is insufficient. It will provide relief if you use a plaster comb over it after it has partially hardened. The surface is primed and a second layer is applied after this layer has dried. Only the reinforced mesh receives the second layer if surfaces made of cement or polystyrene foam are plastered.

There are two methods for laying the mesh: on PVA or on a very thin layer of plaster. Both methods encourage using a spatula to press and smooth the mesh. The irregularities and bubbles vanish entirely.

Next, sand, trim any excess, prime, let dry, and then reapply Rotband. One layer of plaster, about 15 mm thick, covers the ceiling.

Aligning walls and corners

When the putty layer is fully dry, you can start leveling the surface and any nearby corners. The first factor affecting the time is Rotband’s composition. Increasing the amount of gypsum content or adding long-drying admixtures are two possible options. Second, during the drying process, the proper amount of water in the dry mixture is crucial. Long drying times won’t be an issue if you follow the directions.

Humidity and ambient temperature have a significant impact on putty’s adhesion. When the solution is left at room temperature, between +15 and +25 0 degrees, it dries quickly and covers the wall evenly. Higher or lower values have an adverse effect on the composition’s quality and hardness.

Low humidity is ideal for putty; the drier the better. Changes in temperature during the drying process ought to be avoided. Shut all windows and doors tightly for a few hours in order to accomplish this.

Start leveling when the allotted time has passed. Use a lath or spatula to work. On the other hand, the composition fills the depressions and all protrusions are eliminated. A plaster plane is used to trim off any irregularities in the corners. The surface is then regarded as ready for cladding.

Grouting and priming of surfaces

After leveling the wall, you must wet the surface with water and use a felt float to wipe it down if you intend to apply paint or wallpaper. All of the tool marks will disappear, and the plaster will take on a consistent color that will allow you to add another layer of decoration.

Use a firm brush to massage the putty once it has dried for 15 minutes. Circular movements are required, and the tool should be thoroughly wetted after each turn. All potential imperfections and spatula marks will vanish.

It’s possible that the plaster will show through Rotband if you intend to adhere light-colored wallpaper to it. A coat of finishing solution applied beforehand won’t harm anything in this situation. It will eliminate Rotband’s dark reflection and render the color shift undetectable.

Make sure the surface you want to paint is glossy. To achieve this, the base is thoroughly moistened and smoothed with a metal brush after it has dried and a light matte shade has formed on it. Following this process, you can begin painting it without having to add another layer of putty.

Since freshly applied putty absorbs a lot of moisture, it is necessary to prime the next layer of putty well in several stages before gluing the wallpaper. After applying the first layer of soil, let it dry completely before adding the second and, if required, the third.

Rotband is a multipurpose plaster made of gypsum that is perfect for creating smooth, long-lasting finishes on walls and ceilings. For a perfect finish, there are a few essential steps to applying this plaster. First, prime and clean the surface to get it ready. Apply the Rotband evenly with a trowel after mixing it with water to a creamy consistency. Before the plaster sets, work quickly to smooth out any imperfections. When the surface is completely dry, lightly sand it to prepare it for painting or additional decoration. Rotband can add a polished touch and change any area with the appropriate technique.

Can it be used for drywall??

There is a lot of interest in the potential application of the Rothband rotor to the drywall wall. GCL is frequently utilized for all finishing and construction tasks.

For processing moisture-resistant drywall, Rotband is utilized. The primer is applied with the same characteristics—that is, a uniformly distributed putty layer over the surface. The layer created by Rothband putty on drywall is incredibly resilient and can withstand even the smallest mechanical stresses.

Even though it absorbs moisture, you shouldn’t use it in extremely humid spaces. In these kinds of conditions, drywall can soak and peel off.

The plasterboard sheets must be cleared of all foreign materials. Rotbandband plaster can harm the surface it processes and corrode metal components. The ornamental metal items must be cut and sanded if they cannot be removed from the sheet.

Putty Rotband works on any surface, including plasterboard, metal, wood, and concrete. It’s critical to prepare puttying tools and understand how much mixture is needed for the task at hand.

Step Description
1. Preparation Clean the surface from dust, dirt, and loose material. Apply a primer if necessary to ensure good adhesion.
2. Mixing Mix Rotband plaster with clean water according to the manufacturer"s instructions until you get a smooth, lump-free consistency.
3. Application Using a trowel or putty knife, apply the plaster to the surface in thin layers, starting from the bottom and working upwards.
4. Smoothing Smooth the applied plaster with a straight edge or trowel, removing any excess material to achieve a flat surface.
5. Drying Allow the plaster to dry completely before applying any additional layers or finishing coats. This usually takes several hours.
6. Sanding Once dry, sand the surface lightly to remove any imperfections and create a smooth finish.

Plastering with Rotband gypsum is an easy process that can make a big difference in the quality of your walls. Professionals and do-it-yourselfers alike favor it for its superb adhesion and simplicity of use. You can obtain a long-lasting, glossy finish by following the right procedures.

Make sure your surface is dust-free, dry, and free of loose particles before beginning. As directed by the manufacturer, mix the Rotband plaster until it has a creamy, lump-free consistency. Using a trowel, apply the plaster to the wall, making sure it is evenly distributed. To keep things under control and create a consistent layer, work in small sections.

After plastering, let it harden a little bit before using a finishing trowel to smooth it out. This will produce a smooth finish and help get rid of any flaws. To prevent uneven drying, always remember to work methodically and maintain a consistent thickness. Sand any rough spots that remain after the plaster has completely dried to create a flawless surface that is ready for painting or wallpapering.

The durability and aesthetic appeal of your interior spaces can be significantly enhanced by using Rotband plaster for wall projects. You may get expert-caliber results that raise the appeal and market value of your house with a little practice and attention to detail. Rotband plaster is a dependable and efficient option for finishing new construction or remodeling an existing area.

Video on the topic

How do tiles stick to gypsum plaster?? Real test

Plaster dries quickly, what to do?? Extending the life of expired putty (life hack)

Why does gypsum plaster and putty quickly harden and harden in a bucket, what to do, how to fix it

Is it possible THIS? Plaster in TWO LAYERS. Plaster on plaster. Repair errors. Renovation of apartments.

plaster fell off the wall !!!!!

Is it possible to putty with gypsum plaster?? Rotband, HP-Start, MP-75, Plato Start.

Rotband plaster.Plaster putty Glatt

What factor is most important for you when choosing materials for building a house??
Share to friends
Timur Kiselev

Professional builder with 15 years of experience. I know everything about the construction of houses, cottages, bathhouses and other buildings. I will be happy to share my knowledge and experience with you.

Rate author
StroyArsenal62.com
Add a comment