Specifics of laying communications under a slab foundation

Slab foundation communications installation is a crucial building step that needs to be carefully planned and carried out. This procedure guarantees the safe and effective integration of vital systems, such as gas, electrical, and plumbing lines, into a building’s foundation.

A slab foundation’s affordability and longevity are two of its key benefits. Underneath this strong foundation, integrating utilities can provide particular difficulties. It is essential to lay these communications correctly in order to avoid future problems like leaks or electrical problems, which can be expensive and challenging to fix after the slab is in place.

Comprehending the intricacies of this undertaking can aid homeowners and builders in making knowledgeable choices and steering clear of typical pitfalls. Every stage of the project, from precisely locating the utilities to selecting the appropriate materials, is critical to its success.

This post will examine the essential elements of installing communications beneath a slab foundation and provide helpful advice.

Requirements

The installation of life support systems (water supply, sewage, and electricity) in cottages constructed on slab foundations is governed by standards as per SP Nos. 31-110-2003, 31.13330, and 32.13330. Simultaneously, practicing engineers advise being especially mindful of communication line maintainability.

As per the current construction regulations, locations for sleeve laying are arranged during the formwork construction phase rather than puncturing holes in the hardened monolith for utility networks.

The following elements need to be considered throughout the procedure:

  1. To lay the “warm floor” system and water supply lines, pipes with a diameter of 16 to 20 mm are used. For sewerage installations, polyvinyl chloride pipes with a standard diameter of 110 mm are used. If according to the project the house has a lot of plumbing fixtures, the sewer line is long, or there is no provision for a pit, then pipes with a diameter of 160 mm are used.
  2. The minimum permissible sleeve size is 5 cm.
  3. When seasonal temperature changes occur, linear expansions occur in the soil, so when laying engineering systems, special compensators are used.
  4. Water supply lines are laid below the freezing level, otherwise heating cables are run in parallel or polystyrene shells are used.
  5. The electrics are placed in sleeves with a bending radius from 0.3 to 0.7 m. This position makes this communications unit repairable in case of damage. Power supply lines are routed to a panel, which is usually located next to the house.
  6. It is forbidden to introduce a gas pipe into the house through the thickness of the foundation; for these purposes, make a hole in the outer wall and insert a sleeve into it for protection. All places where pipes are connected must be located in such a way that the contact point can be inspected at any time and repaired if necessary.

The developer will be able to save even more money on heating utility lines because the soil cannot freeze beneath the base area of a monolithic foundation in the body through which heating pipes (like USHP) pass.

At what stage of construction is the laying carried out??

When building a slab foundation, the underlying layer’s preparation must come first, followed by the installation of utility networks in the building area. The majority of builders believe that installing utility lines earlier, when the formwork is already ready, is more convenient and easier than laying the reinforcing frame.

It is easy to miscalculate the outlets and risers, which could be either inside the wall itself or too far beyond it, if the water supply and sewer pipes are laid before the formwork is erected. Since the installation of the molding structure has already given the slab foundation its shape, experts advise installing communication systems.

Laying principles for slab foundations

The following guidelines serve as a foundation for designers when creating a slab foundation when deciding on the engineering system scheme:

  1. Communication networks are laid before the screed is concreted.
  2. It is not recommended to lay pipes under the slab without a protective sleeve. The sleeves must be slightly larger than the diameter of the pipes and at the same time made of high-strength material to prevent mechanical damage when pouring concrete mortar.
  3. To prevent the risk of sewer pipes freezing, they are laid below the soil freezing level. In this case, it is necessary to take into account the fact that the drains flow in the direction from the house, therefore they initially have a higher temperature than in the water supply lines. This allows builders to reduce the thickness of the shell for insulation.
  4. If water lines are laid above the freezing point, which is typical for most sites in all Russian regions, then the developer needs to consider measures for their insulation.

Where and how to establish communication networks?

There are two methods for installing communications with a slab foundation, including cables, water supply, and sewerage:

  1. Through the foundation — into the slab itself through formwork for basement floors with deep recess.
  2. Directly to the bottom of the pit under the foundation itself, if it is shallow. Here communications are located below the freezing level or are insulated with foamed polyethylene.

Sewer networks, pipelines, and cables must all be routed separately in accordance with regulations.

Excavated beneath communication lines, these trenches are fortified with middle fraction crushed stone or compacted sand. Utility line entry holes need to be at least 0.2 mm broader than the pipe diameter. An oil seal is used to guarantee the structure’s tightness at high groundwater levels. Special elastic materials are used for this purpose in dry soils.

In order to prevent mechanical damage from human traffic or soil cultivation, sewer networks typically lead to the foundation at a minimum depth of 0.7 meters below the ground’s surface. To ensure gravity flow, the sleeve is placed at a slope of 4 to 7 degrees.

Generally speaking, electrical network cases fit the prepared well in terms of shape. To make it simple to pull a new cable or hose through the case if needed, a metal cable with a rope attached is pulled through the sleeve.

If the chance to add communications during the slab foundation preparation stages was lost, it is still feasible to add them after the house is built by drilling holes in a concrete monolith or fastening an insulated box to the wall.

Installing a slab foundation’s heating systems is often done concurrently with the pouring process because it can function as a floor in a house. A spiral, winding plastic or metal pipeline embedded in concrete that allows heated water to flow is known as the "active heated floor" system.

The developer only needs to consider finishing as a result, with the foundation surface acting as a subfloor directly.

Following the working drawings, the active heated floor pipes are arranged along the reinforced mesh. The reinforcing mesh is fastened with nylon clamps. It is essential to install a manifold and connect the pipes to it once all of the underfloor heating pipes have been installed. The location of collector installation is precisely specified by working drawings.

Make a hole in one of the outer walls’ lower portions, not in the foundation’s thickness, to properly introduce gas into the house. Only a solid section of pipe can be found inside the protective sleeve, which is used when handling gas pipes.

Problems and their solutions

The majority of builders believe that installing utility networks inside the foundation’s body without having access to them while it’s in use is not a good idea.

Naturally occurring wear and tear may, at the very least, render pipes and cables useless.

However, there is always a chance that communications issues, such as broken seals, loose connections, or clogged pipes, could occur at some point. As a result, it is unclear whether communications installed on a slab foundation can be maintained.

If pipes and cables are first placed in unique cases and removed into a special pit, an inspection well outfitted with a technical room, it is possible to install a repairable system. The caisson can be used as needed and, if desired, shut with a decorative lid.

The pit is a distinct subterranean space with a concrete floor and walls. Generally, a structure of 0.7 x 0.7 x 0.7 m is constructed. They dig a pit first, and then they lay the foundation slab.

The pit should normally be situated outside the blind area’s bounds. As a result, in the case of a pipeline accident, wastewater will flow straight into the pit rather than building up beneath the foundation. The owner has the option to replace or fix communication networks whenever they see fit.

The design of the foundation slab must be complicated for the installation of a pit, which raises construction costs. However, as experience has shown, if a domestic communication system accident results in the complete collapse of the power structure, the expense of replacing pipes is not comparable to the risk of having to build a new foundation or home.

Repair options

If replacing damaged underfloor heating pipes requires removing the floor covering and the upper layer of concrete, then there will be a substantial labor, time, and material cost associated with repairing communications beneath the insulation layer. In this instance, breaking the compacted layer of the sand cushion will undoubtedly cause the base’s stability to deteriorate, which cannot be made up for once the emergency has been resolved.

Sleeves under the lines guarantee the maintainability of communication systems under slab foundations, as mentioned earlier:

  • water supply,
  • power supply,
  • sewer.

Typically, every case is dumped into a pit that is accessible to the building’s owner. It is possible to extend newly constructed and renovated networks as well as remove broken lines through the sleeves. Digging from the side of the house is another way to reach the pipes.

Since the soil’s bearing capacity is compromised in the latter scenario, the majority of practicing engineers advise installing maintainable communication networks in a slab foundation. Professionals should be tasked with choosing the best angles of inclination for trenches used for sleeves and with laying out communication lines.

Aspect Description
Planning Start by mapping out where utilities like water, electricity, and sewage will go. This helps in avoiding conflicts and ensuring everything fits well under the slab.
Trenching Excavate trenches for the pipes and cables before pouring the concrete. Make sure the trenches are deep and wide enough to accommodate all the lines.
Pipe Protection Use protective sleeves or conduits to shield pipes and cables from damage. This prevents cracks and leaks in the future.
Testing Before pouring concrete, test all pipes and cables for leaks and functionality. Fix any issues to avoid problems later.
Concrete Pouring Pour the concrete carefully, ensuring it covers all the pipes and cables without causing any damage.
Inspection After the concrete has set, inspect the slab to ensure there are no issues with the buried utilities.

One of the most important steps in guaranteeing the longevity and functionality of any building is to lay communications beneath a slab foundation. In order to prevent problems down the road and expensive repairs, careful planning and execution are crucial. You can avoid possible problems like inadequate access for maintenance or system interference by carefully planning the locations of all utility lines.

It’s also crucial to select the appropriate materials for your conduits and pipes. The pressure and conditions beneath a foundation can be withstood by resilient, corrosion-resistant materials, guaranteeing a longer lifespan and fewer issues later on. This step adds to the overall stability of the structure and ensures the effectiveness of your utilities.

Working with experts during the planning and installation stages can also yield insightful knowledge and experience. Professionals can assist in identifying possible problems and offering solutions, ensuring that your project complies with all applicable building codes and standards. This partnership can decrease mistakes, save time, and improve

Planning carefully is essential when installing communications beneath a slab foundation in order to prevent problems later on. Before the concrete is poured, plumbing, electrical, and HVAC systems must be carefully positioned to protect them from potential damage and to make maintenance easy. In addition to saving money and headaches, careful planning and installation can guarantee a sturdy and dependable foundation for your house or structure.

Video on the topic

LAYING COMMUNICATIONS UNDER THE FOUNDATION PLATE. INSTALLED A CONCRETE DRAINAGE WELL

Mortgages for communications in the foundation

Sewerage Under a Monolithic Foundation – Important Nuances!

Communications in the foundation of a private house | KP Close | Construction of a house in Krasnodar

How to introduce communications, water, sewerage and electrical cables into the house.

What Communications Need to Be Layed Before the Foundation Construction? | MONOLITHIC PLATE

INSTALLATION OF MORTGAGES IN THE FOUNDATION

🔴 SEWER AND CELLS FOR WATER AND ELECTRICITY 🔴 How to make it under a monolithic slab with your own hands ?

What factor is most important for you when choosing materials for building a house??
Share to friends
Milan Yashina

Design engineer, specialist in development of design documentation. I will help you correctly design your home or other building.

Rate author
StroyArsenal62.com
Add a comment